|
Product Details:
Payment & Shipping Terms:
|
Color: | Black | Accessories: | Yes |
---|---|---|---|
Warrant: | 5 Years | Spray Type: | Pull Out |
Function: | Cold & Hot | Style: | Contemporary |
High Light: | bathroom sink faucets,bathroom sink taps |
ROVATE Deck Mounted Pull Out Basin Mixer Faucet 2 Way Cold and Hot Water
Product Discription:
Place of Origin: Zhejiang, China (Mainland)
Brand Name: ROVATE
Model Number: 6668-1
Feature: Pull Out Basin Faucets
Surface Treatment: Polished
Installation Type: Deck Mounted
Number of Handles: Single Handle
Style: Contemporary
Valve Core Material: Ceramic
Number of Holes for Installation: Single Hole
Spray Type: None
Usage: Basin mixer
Cartridge: 35mm ceramic cartridge
Plating: 24hrs acid salt spray test
Hose: Stainless steel hose 500cm*2
Body Material: H59 A-grade brass
Handle Material: Zink Alloy
Thickness: Ni:10-12um, Cr :0.2-0.22u
Aerator: Swiss Neopearl Aerator
Net Weight: 1.19kg
Surface Finishing: Blacken
Model No. | 6668-1 |
Product Description | ROVATE manufacturer brass kitchen faucet pull out sink mixer with sprayer |
Material | Brass body(Cu≥59%), zinc alloy handle |
Finish | High Quality Chrome Plated |
Thickness of Plating | Nickel 8~10μm, Chrome 0.25~0.3μm |
Cartridge | Ceramic cartridge with 500,000 life cycles |
Water Pressure Test | 1.2 MPa, no leakage |
Air Pressure Test | 0.8 MPa, no leakage |
Acid Salt Spray Test | 24 hours, no corrosion |
Neuter Salt Spray Test | 96 hours, no corrosion |
Flow Rate | Basin/kitchen/bidet mixer ≥ 12L/min, bath/shower mixer ≥ 18L/min |
Guarantee | 5 years quality guarantee |
Certification | CE, EN817, ACS, BV, ISO9001 |
Casting
Supplemented by Italy IMR gravity casting machines, the near-net shape of the faucet body could be unparalleled achieved with high construction quality.
Machining
All faucets may require numerous machining operations. For instance, over 32 machining operations are required for bigger faucet bodies using a rotary machining center controlled by computer program. With the proper machine, it can take as little as 14 seconds to make a part.
Polishing Inspection
All manual polished parts are visually checked for surface imperfections, which are removed by sanding to have the parts finished to a high degree of smoothness.
Plating
First a base coating of electroplated nickel is applied, followed by a thin coating of electroplated chromium. The whole process is deposited from over 30 plating baths containing certain additives that improve corrosion resistance and durable shining chrome.
Plating Inspection
EN standard is applied on the plating line to guarantee the finish quality. The nickel coating is up to 25μm, and the chrome coating is up to 0.25μm, pass 200 hours NSS testing.
Laser Etching
Using proper current intensity to control the laser power, thus the chrome coating won’t be destroyed for finish stability.
Assembling
This process takes place on rotary assembly machines, which are precisely controlled. More than 20 parts stored in bins will be put together by manual and automated processes.
Supply Ability:
1000 Piece/Pieces per Month
Packaging Details:
Inner packing: Foam, brown carton box
Port: ningbo
Lead Time : 25 days for 20GP and 35 days for 40HQ,3 Days for sample